Assessment and upgrade report of Wastewater Treatment Plant in Beit Dajan, Nablus District

This study is highlighted and summarized the main findings, results, and lessons learnt for the conducted assessment study, presents and develop propose upgrade system and focus on the recommendations and prepare of cost estimate

Assignments in detail are lustrated as follow:

Prepare a status report for the existing system includes the following key steps
* Analysis and assess the operation of existing WWTP
* Highlight the main deficiency of the existing system.
* Quantity of the water discharge in normal and peak events.
* Analysis and assess the existing irrigation distribution network

Proposed upgraded system report includes the following works:
*Develop a proposed upgrade/ alternative systems
*Upgrade and extension of the existing irrigation distribution networks
*Prepare a cost estimate for the upgraded systems.

Information

Location
Beit Dajan, Nablus District
Client
GVC
Status
Complete
Year of completion
2019