Design Flow Measurement Systems for Trans-Boundary Wastewater Streams

Project include:
* Carry out and develop a detailed baseline information for installation and operation of flow measurement in the targeted streams. Work shall include under the following activities and tasks
* Undertaking site visit and carrying our topographical survey if necessary
* Assessment of flow volume in the selected wadis, including minimum and maximum, seasonal inflow;
* Assessment of systems of flow measurement options and comparison in regards to capital costs, operation and maintenance needs and costs, sustainability, ease of construction, accessibility, etc. The assessment should consider peak factors and characteristics of the wastewater flow to account for screening requirements; and,
* Recommendation of the most suitable systems.

Information

Location
West Bank
Client
UNDP
Status
Complete
Year of completion
2019